Description
A water treatment is used to clean dirty water from a plastic washing line for reuse. ASG’s water treatment system can handle two washing lines at the same time.
How It Works
The first step is a primary filter with 60 mesh that can remove the large contaminations. Two air floating pumps are used to float contaminations to the top. Additionally, MPA and MPH are added into the water treatment to accumulate the contaminations.
The top accumulated contaminations are lifted by scrapers.
Models & Specifications
To ensure the durability of ASG’s pre-washer, the washer is made from 304 stainless steel.
Primary Filter: |
1) Main Motor Power: 4KW 2) Blower Power: 2.2KW 3) Screw Diameter: φ245mm 4) Screw Material: stainless steel 304 5) Screw Rotating Speed: 0~45rpm 6) Filtering Area: 2.5m2 7) Filtering Screen Size: 80mesh 8) Frame Material: A3 9) Water Tank Volume: 2m3 10) Water Tank Material: carbon steel 11) Water Pump Power: 2.2KWX2 |
Intermediate Pump: |
1) Pump Power: 1.5KW X2 2) Flow Rate: 20 m3/h |
Air Floatation Pond: |
1) Flotation Motor Power: 7.5KW 2) Flow Rate: 16 m3/h 3) Pressure: 0.4MPa 4) First Scrapper Power: 0.25KW 5) First Scrapper Speed: 1.6rpm 6) Second Scrapper Power: 0.37KW 7) Second Scrapper Speed: 2rpm /td> |
Clean Water Pond: | 1) Volume: 17 m3 |
Clean Water Pump: |
1) Motor Power: 4KW 2) Flow rate: 20 m3/h |
Air Floatation Pump: |
1) Motor Power: 1.1KW 2) Flow rate: 5 m3/h |
Place An Order
The general lead time for all single-piece, standard equipment orders is 30 days. For custom orders or complete washing lines, the lead time is between 60 – 90 days. The actual lead time will depend heavily on the complexity of the project as well as the amount of machinery we have in queue at the time of your order.
Contact us to discuss pricing and ordering details. Here is a brief summary of our ordering procedures.